The 46 TWh (4.1 Bcm) Dutch Bergermeer gas storage facility will operate with restricted withdrawal capacity through most of Thursday's gas day, operator TAQA said Tuesday.
During the outage, which will run from 0600-2300 CET (0400-2100 GMT), only 58% of withdrawal capacity will be available. Injection capability will be unaffected.
Bergermeer is currently in summer injection mode, with the facility nominated to net inject 23 million cu m/day Tuesday.
TAQA announced last week that it had sold out Bergermeer storage capacity for 2016-17